PRODUCTION
Our production started in 1978 at Gedikpaşa moved to Bayrampaşa in 1981 and since 1995, it has been done in our production facility with a closed area of 13.000 m2 in Tuzla Leather Organized Industrial Zone, Istanbul. With more than 150 personnel, 5 injection machines and robotics technology, the annual production capacity has exceeded 1,600,000 pairs.
TECHNOLOGY
In our facility, TPU/PU and PU/PU double density injection, single and double color rubber injection and goodyear welt production methods are applied. In addition, since 2004, GORE-TEX® licensed products have been integrated into our production